Final post-construction clean of a school catering facility in Prague 12 — 348 m² across two floors.

Area
348 m²
Scope
two floors
Team
6-person team
Duration
2 working days
Location
Prague 12

This project covered the final clean after renovation works in a school catering facility in Prague 12. The premises still held fine building dust, soiled floors and grout lines, and back-of-house areas that needed preparing for inspection and handover.

The work covered 348 m² across two floors. A 6-person team completed the clean in 2 working days.

Scope of work

  • removal of fine building dust from floors and accessible surfaces
  • cleaning of floors and grout lines
  • cleaning of wall tiles
  • cleaning of storage and operational areas
  • cleaning of shelving
  • surface cleaning of accessible technical pipework
  • cleaning of washroom facilities
  • final detailing ahead of handover

The project was completed within the agreed timeframe, leaving the premises ready for final inspection and handover.

Before and after photographs

Storage and operational areas

Before cleaning

Storage areas before post-construction cleaning

After cleaning

Storage areas after cleaning was completed
Operational room with floors after building works

Before cleaning

Floor with building dust before cleaning

After cleaning

Cleaned floor after the work was completed
Washroom facilities

Before cleaning

Washroom facilities before post-construction cleaning

After cleaning

Washroom facilities after cleaning was completed